• Location: Cabarrus and Mecklenburg Counties, NC

Construction Oversight of the Piedmont Improvement Project (PIP)

Observation of second mainline track; control point, grade separation (rail and roadway), rail bridge, and culvert extension construction; control point retirement; grade crossing closings; and industrial leads/sidings and rail bridge modifications for the PIP – Haydock to Junker (“H2J” NCDOT TIP P-5208A-I)